Click to enlarge image
|
Shortening of construction term & Easiness of
maintenance
The First Advanced Treatment of Nitrogen/Phosphorous
(First Korea)

Comparison of Power Cost
|
Item
|
Power
(kW.h)
|
Unit cost
of Power
(\/kw.h)
|
Daily
Power Cost
|
Monthly
Power Cost
|
|
General A2/O series
(Stirrer, Pump)
|
70.08
|
45.0
|
$2.68
|
$80.59
|
|
n-CNR
Package System
|
38.88
|
45.0
|
$1.49
|
$44.71
|
|
Monthly Power
Curtailment
|
31.2
|
-
|
$1.19
|
$35.88
|
n-CNR Modeling
|
Model
|
Capacity
(m3/day)
|
Size
Height(Ø) x Length(L)
|
|
n-CNR50
|
50
|
Ø2.5 x L7.7
|
|
n-CNR80
|
80
|
Ø2.5 x L8.7
|
|
n-CNR100
|
100
|
Ø2.8 x L9.0
|
For the same capaciry(50m3/day), about 44.5% curtailment of power cost is expected.
|
|
|
|
| |
|
|
|